Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был на сайте более двух недель назад

Кандидат

Мужчина, 38 лет, родился 1 февраля 1987

Аксай (Казахстан), готов к переезду (Казахстан, Россия), готов к командировкам

Lead Telecommunications Engineer

800 000  на руки

Специализации:
  • Другое

Занятость: полная занятость, проектная работа

График работы: сменный график, удаленная работа, вахтовый метод

Опыт работы 15 лет 6 месяцев

Декабрь 2013по настоящее время
11 лет 4 месяца
NCOC n.v.
Lead Telecommunications Engineer
Oil and gas
Декабрь 2013по настоящее время
11 лет 4 месяца
NC Production operations company b.v/

www.ncpoc.kz/

Telecom Maintenance Engineer
Responsible to perform and supervise the scheduled and unscheduled maintenance of Telecommunication and Network systems & equipment including proactively identifying and resolving problems and minimizing downtime – in a safe manner and compliance to maintenance procedures. Provide specialized expertise within the Offshore or Onshore Team, with respect to Telecommunication and Network equipment, to include the preparation of maintenance / inspection plan and spare parts selection. Accountabilities and Responsibilities: • To operate the many complex telecommunications and IT systems in the production facilities which include: o Terrestrial and Satellite radio systems across the RF spectrum from HF to Microwave; o Telephone systems. (Hazardous and Non-hazardous areas); o Public Address and General Alarm systems; o Transmission system (SDH, Fibre cable systems); o Access Control system; o CCTV system; o Intrusion Detection; o Data networks, cabling and hardware; o Telemetry and ESD systems; o Desktop application support. o Entertainment systems;
Январь 2012по настоящее время
13 лет 3 месяца
Imtech

imtech-bolashak.com/

Telecom Comissioning Engineer
 Carry out of Mechanical Complition (MC), PREcommissioning and Commisioning tests, SAT tests and Maintenance on PAGA system, PABX system, Telephone ATEX system and Safe area phones, CCTV system, Access Control system, Network Managementsystem, Intercom System, Hot Line System, SDH System,Intertainment system, UHF Leaky feader, Fiber optics, Inmar Sat, UHF\VHF Radios, Non directional beacons, Vessel Tracking System, Automated tracking system. All PreSTART UP and STARTUP tests and activity, Handover to Operations Walkdowns., Familiar with ICC procedures, work with ACS and IMIS system. Producing redline drawings for production and maintenance handover at final commissioning. Testing and fault finding of all telecoms systems, cabling and installation from hook-up and construction.
Октябрь 2009Декабрь 2011
2 года 3 месяца
Kentech
Senior Instrument Technician (Construction)
 Assembling of Loudspeaker systems & CCTV Cameras  Assembling of Fire & Gas systems  Power & instrumental cables Insulation Meger test  Assembling of of impulse tubing. PID diagrams reading.  BOSIET Certificate and Agip KCO passport.  Pulling of the power and instrumentation cables.  Laying and fixation of power and instrumentation cables.  Installing Cable Gland.  Installation and connection of junction boxes.  Installation, connection instruments (devices).  Installing Cable Gland and connection power and •instrumentation cables in distribution boards.  Installation of grounding on cable trays, junction boxes, •distribution boards.  Reading and work with drawings, wiring diagrams, cable management journals Installation of tire earth.  Assembling and connection of distribution boards.  Manufacture, assembly, installation of cable trays.  Manufacture, assembly, installation of supports for cable trays and tools.  Opening permit to work for electrical installation work,  Preparation of risk assessment and method statement of upcoming work.  Reading and work with drawings, wiring diagrams, cable management journals.

Навыки

Уровни владения навыками
Maintenance
Telecommunications
Engineering
truobleshooting
Avaya Call Management Systems
Cisco
Motorola
GAI tronics
Nevron
Sattelite
VHF
Wifi networks
Puplic adress and General Alarm
PABX
PAGA
CCTV
Hazardous areas
Ex Zones
Supervision
Planning
MIE
SAP
IPTV
Access control
ATS
S3ID

Обо мне

Examples: PABX Avaya system: Non Hazardous and Hazardous area equipment(Ex). Avaya software 1st line support administration. IP Telephone stations programming and configuration according with project needs. Installations and commissioning on PABX. Duties include terminating and testing Multicore cable Cross connection of crone blocks Work with digital and analogue lines Terminating RJ45 and RJ11 patch panel. All labeling and Network testing of physical lines Continuity and voice testing of all Line jacks Programming of Hazardous area ATEX phones Document management and redline defects DATA, FO: Non Hazardous area equipment Management of FO routs. Work with Cisco and HP access switches. RAD, FOM, to provide temporary and permanent data connections for offices and control panel consoles. Work with Core switches and WLAN controllers. Management of Wireless access network Wi-Fi for Living quarter entertainment needs, built on Cisco equipment. Mobile vessel DATA and Voice interface including FO splicing using Fujikura FO splicing equipment. Entertainment IPTV system. Non Hazardous area equipment Full installation and commissioning of IPTV Nevron system for LQ 200 rooms users, system configuration and management. Satellite signal distribution, creating of Video on Demand service (Vod), and Not on demand streaming channels. PAGA system: Non Hazardous and Hazardous area equipment(Ex). Software administration, PLC settings checks. Maintenance routine checks and scheduled system checks, including all kinds of troubleshooting and remedial works in order to keep system operational. Integration with temporary vessels and their internal PAGA equipment. Ability to diagnose engineering problems coupled with the skills required to devise and implement cost effective solutions Installations and commissioning on PAGA Duties include terminating and testing Multicore cable, labeling Continuity and Impedance checks of the PA speaker lines Choosing tapings as per design drawings of PA speakers Continuity tests , diagnosing of engineering problems on PAGA Flashing Beacons including maintenance tests All precommissioning testing on PAGA system including Tick tone tests and Simulating of Fire and Gas alarms via maintenance panel Maintenance handover at final commissioning Access control system: Non Hazardous and Hazardous area equipment(Ex). ACS Andover continuum software administration. Issuing if access badges with necessary Access restrictions. Routine maintenance and scheduled equipment checks. Troubleshooting of faults and necessary remedial works in order to keep system operational including all cabling and equipment repairs. VTS Non Hazardous and Hazardous area equipment(Ex). Vessel tracking system servers, radars and antennas scheduled and routine checks. Check of AIS and Radar servers in order to provide normal operation of system. VHF/UHF/MF/HF/NDB/Airband Non Hazardous and Hazardous area equipment(Ex). VHF Motorola 850Ex, 810Ex and MTM 800 programming, administration according to project specification. Issuing and creating of ISSI, Talk groups, changing and remote configuration of hand radios and base stations. Equipment checks based on scheduled maintenance needs. Troubleshooting and repairs for all kind of radio equipment. CCTV system: Non Hazardous and Hazardous area equipment(Ex). All kinds of maintenance checks, system configuration and troubleshooting, like faulty equipment replacement. Work with Video Recording Servers (NVR) in order to provide video footage of events captured with video cameras on cite. Installations of CCTV cameras and commissioning Testing of CCTV system physical lines including bonding, termination, dressing of cables Checking of proper terminating on the field side as per work drawings Continuity and voltage tests before all final walk down and handover to operations team Isolations: Non Hazardous and Hazardous area equipment(Ex). Has recently been Primarily involved with the telecom ICC’s and has done a sterling job providing these isolations in a safe and practical manner to all Contractors etc across the Island Reviewing of Permits to work of construction group Choosing of the safe way of isolations on necessary equipment Preparing all necessary work drawings, forms and cooperation with PTW coordinators and PRA persons during process of isolations Checking faults and diagnose engineering problems after construction group complete their works, before make equipment live. Supervision, planning, work preparation, spare part ordering, Maintenance Integration Execution (SAP) and other of many skills in telecommunications.

Портфолио

Высшее образование (Бакалавр)

2009
West Kazakhstan Technical university after Zhangir Khan
PolyTechnical, Instrument Engineer

Знание языков

РусскийРодной


АнглийскийC2 — В совершенстве


Повышение квалификации, курсы

2011
Проверка знаний по промышленной безопасности на нефтяных месторождениях
Mr. Doors-Atyrau
2011
BOSIET
Seftec

Тесты, экзамены

2017
Maintenance in upstream in operations and other disciplines P153L
Shell, Course id 00126757
2014
SAP RBT
NCPOC, Maintenance integration Execution

Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения