Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяCandidate
Male, 44 years, born on 26 August 1980
Almaty, willing to relocate (Azerbaijan, Aksay (Kazakhstan), Aktau, Aktobe, Almaty, Astana, Atyrau, Bautino, Belarus, Other regions, Russia, Uralsk), prepared for business trips
Project Engineer/Manager; Construction Engineer/Manager; Facilities Engineer/Manager
Specializations:
- Sales manager, account manager
Employment: full time, project work, work placement
Work schedule: full day, shift schedule, flexible schedule, rotation based work
Work experience 18 years 5 months
January 2014 — currently
11 years 3 months
Tengizchevroil
Lead Project Engineer
Over the last 4 years I have performed the work as Lead Project Engineer and Team Lead for Plant Utilities and Environmental/Infrastructure projects. At present time I am working as Field Execution Team Lead.
- Supervision of Field projects team
- Direct reporting to TCO Capital Projects Team Lead
- Coordination and support Planning, Budget control and Forecast, Technical and Engineering Consultancy.
- Interface with TCO FE Departments – Construction, Reliability, Quality Control, Turnover, Regulatory Affairs, Business Support, Design Engineering, Process Engineering, Operations Project Support, Maintenance, Base Operations.
Current projects:
- Pipeline repairs
- Metering Stations Manifold Upgrade Program
- Field Valve Upgrade
- Wellhead Control Panel Upgrade
- Knock Out Drum pupms Upgrade
Responsibilities:
Feasibility Study
Design Review
PHA/HAZOP
Project Control
Planning
Contracting
Procurement Plan
Project Execution
Constructability review
Change Control Management
Regulatory Affairs
Progress Reporting
Project Close Out
September 2011 — November 2013
2 years 3 months
Tengizchevroil
Atyrau, www.tengizchevroil.com
Oil and Gas... Show more
Project Completions and Commissioning Manager
- responsible for interface between all project groups
- responsible for completion of works, QC documentations, RA activities
- Supervision of Completions and Commissioning teams
- Reporting to Project Manager
- Coordinating Contractors groups and companies
November 2010 — September 2011
11 months
"AksaiGasService" JSC
Aksay (Kazakhstan)
Director of Production and Technical Department
- Supervision of all current projects issued by KPO b.v.
- Reporting to President and Operations and Construction Vice-President of Company regarding to current status of
works on objects.
- Coordinating company relations with KPO b.v. and Sub-Contractors.
- Preparing all documentations and procedures of department.
August 2010 — November 2010
4 months
"AksaiGasService" JSC
Aksay (Kazakhstan)
Project Execution Manager
- Preparing schedules, reports and other documents regarding the GPI project (KPO b.v.)
- Control and support for Execution of GPI project with international team
- Coordination between Client and Contractor; Contractor and Subcontractors
- Supervision all stages of project execution, milestone meetings and other issues
- Support to Business Development Department, preparing procedures of company
June 2010 — August 2010
3 months
GATE (GAMA-Tekfen) KIB (Kashagan Industrial Buildings)
Construction Mechanical Engineer
- General responsibilities of Mechanical Engineer include HVAC (Heating, Ventilation, Air Conditioning) works of AgipKCO Karabatan KIB (Onshore) site.
- Presuming supervision of site building construction HVAC works (Main Gate House, Central Control Building, Temporary Refuge, Change Room, Warehouse, Electrical Workshop, Mechanical Workshop, and Laboratory), providing Red-Line Markups on drawings, coordinating with client representative inspectors.
November 2009 — June 2010
8 months
JSC PSNKazStroy
Atyrau
Project Engineer; Mechanical Engineer
Approved as an Associate Project Engineer for TCO (TengizChevrOil - Chevron) - PFU (Plant Firewater Upgrade) project. Evaluation of firewater pipes, pumps, pits for PFU project.
Start work as a mechanical engineer. Working with TCO projects: preparing Data Sheets, SDRL (Supplier Data Requirement List)’s, Vendors correspondence and other documents.
October 2007 — June 2009
1 year 9 months
Istanbul Technical University
Turkey, www.itu.edu.tr
Educational Institutions... Show more
Research Assistant
Laboratory works with special software programs: Ecrin 4.10, FORTRAN, and Word Excel
Assisting in some experiments, calculations, preparing reports.
Observance some calculations and compliance works regarding to Graduate Thesis.
June 2007 — August 2007
3 months
February 2004 — July 2004
6 months
Taraz State University
Taraz
Teaching assistant
Assisting of professors, helping in preparing of lectures, software.
Developing and compiling broshures and broadsheets.
Labaratory assisting, analyzing new technological experience, preparing some applications.
January 2003 — March 2003
3 months
Karachaganak Petroleum Operating
Aksay (Kazakhstan), www.kpo.kz
Operator
Trainee operator at Unit-3 and in Well Operations department.
June 2001 — September 2001
4 months
Caspimunaigas
Atyrau
Oil and Gas... Show more
Technician of 7th category
field data gathering;
interpretation of reservoir data of Tengiz, Korolevskoe and other fields;
preparation of reports;
site visits
About me
I am working within Tengizchevroil Facilities Engineering Projects Engineering Department. I have several projects in portfolio and four positions of direct reports. The budget of projects between $ 5MM and $100MM.
I was involved in construction and completion of Wastewater Treatment and Recycling Facilitites processes at Tengiz field.
I have worked as Director of Production and Technical Department and as Project Execution Manager within "AksaiGasService" JSC in 2010-2011, Karachaganak field.
On 2010, I have been involved in construction of Kashagan Industrial Buildings at Karabatan as Construction Mechanical Engineer of PIM company (HVAC Contractor of GATE Company).
Before this, I have worked as an Associate Project Engineer and Mechanical Engineer in PSN company and had a good experience been working with specialists from UK and Kazakhstan. They supported me with multidisciplinary issues.
Whilist studing in Turkey I have been invited to participate in laboratory works as an assistant and it was conditionally needed for my graduate thesis completion.
My thesis project includes reservoir and production parts of Petroleum and Natural Gas Engineering. I analyzed field performance prediction of oil and gas reservoirs. I used Fortran and Ecrin 4.10 (Saphir) programs for my research.
Moreover, my last internship within Weatherford company consists Well Logging, Wireline. I worked at Zhanazhol and Kenkiyak fields in Aktobe oblast of Kazakhstan and experienced in team work.
In 2003 I had experience as bachelor student in Karachaganak field of Western Kazakhstan oblast. I experienced in Production Department and then in Unit-2 as technician-operator and translator.
Higher education (master)
2009
Istanbul Technical University
Petroleum and Natural Gas Engineering, Master of Science
2003
Taraz State University
Petroleum and Natural Gas Engineering, 5 year engineer
Languages
Tests, examinations
2014
TOEIC
TengizChevrOil, Test of English for International Communication
2006
TOEFL
Istanbul Test Center, 187/300
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Armenia, Belarus, Kazakhstan, Kyrgyzstan, Russia
Desired travel time to work: Doesn't matter