Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Candidate

Male, 44 years, born on 26 August 1980

Almaty, willing to relocate (Azerbaijan, Aksay (Kazakhstan), Aktau, Aktobe, Almaty, Astana, Atyrau, Bautino, Belarus, Other regions, Russia, Uralsk), prepared for business trips

Project Engineer/Manager; Construction Engineer/Manager; Facilities Engineer/Manager

Specializations:
  • Sales manager, account manager

Employment: full time, project work, work placement

Work schedule: full day, shift schedule, flexible schedule, rotation based work

Work experience 18 years 5 months

January 2014currently
11 years 3 months
Tengizchevroil

www.tengizchevroil.com

Lead Project Engineer
Over the last 4 years I have performed the work as Lead Project Engineer and Team Lead for Plant Utilities and Environmental/Infrastructure projects. At present time I am working as Field Execution Team Lead. - Supervision of Field projects team - Direct reporting to TCO Capital Projects Team Lead - Coordination and support Planning, Budget control and Forecast, Technical and Engineering Consultancy. - Interface with TCO FE Departments – Construction, Reliability, Quality Control, Turnover, Regulatory Affairs, Business Support, Design Engineering, Process Engineering, Operations Project Support, Maintenance, Base Operations. Current projects: - Pipeline repairs - Metering Stations Manifold Upgrade Program - Field Valve Upgrade - Wellhead Control Panel Upgrade - Knock Out Drum pupms Upgrade Responsibilities: Feasibility Study Design Review PHA/HAZOP Project Control Planning Contracting Procurement Plan Project Execution Constructability review Change Control Management Regulatory Affairs Progress Reporting Project Close Out
September 2011November 2013
2 years 3 months
Tengizchevroil

Atyrau, www.tengizchevroil.com

Oil and Gas... Show more

Project Completions and Commissioning Manager
- responsible for interface between all project groups - responsible for completion of works, QC documentations, RA activities - Supervision of Completions and Commissioning teams - Reporting to Project Manager - Coordinating Contractors groups and companies
November 2010September 2011
11 months
"AksaiGasService" JSC

Aksay (Kazakhstan)

Director of Production and Technical Department
- Supervision of all current projects issued by KPO b.v. - Reporting to President and Operations and Construction Vice-President of Company regarding to current status of works on objects. - Coordinating company relations with KPO b.v. and Sub-Contractors. - Preparing all documentations and procedures of department.
August 2010November 2010
4 months
"AksaiGasService" JSC

Aksay (Kazakhstan)

Project Execution Manager
- Preparing schedules, reports and other documents regarding the GPI project (KPO b.v.) - Control and support for Execution of GPI project with international team - Coordination between Client and Contractor; Contractor and Subcontractors - Supervision all stages of project execution, milestone meetings and other issues - Support to Business Development Department, preparing procedures of company
June 2010August 2010
3 months
GATE (GAMA-Tekfen) KIB (Kashagan Industrial Buildings)
Construction Mechanical Engineer
- General responsibilities of Mechanical Engineer include HVAC (Heating, Ventilation, Air Conditioning) works of AgipKCO Karabatan KIB (Onshore) site. - Presuming supervision of site building construction HVAC works (Main Gate House, Central Control Building, Temporary Refuge, Change Room, Warehouse, Electrical Workshop, Mechanical Workshop, and Laboratory), providing Red-Line Markups on drawings, coordinating with client representative inspectors.
November 2009June 2010
8 months
JSC PSNKazStroy

Atyrau

Project Engineer; Mechanical Engineer
Approved as an Associate Project Engineer for TCO (TengizChevrOil - Chevron) - PFU (Plant Firewater Upgrade) project. Evaluation of firewater pipes, pumps, pits for PFU project. Start work as a mechanical engineer. Working with TCO projects: preparing Data Sheets, SDRL (Supplier Data Requirement List)’s, Vendors correspondence and other documents.
October 2007June 2009
1 year 9 months
Istanbul Technical University

Turkey, www.itu.edu.tr

Educational Institutions... Show more

Research Assistant
Laboratory works with special software programs: Ecrin 4.10, FORTRAN, and Word Excel Assisting in some experiments, calculations, preparing reports. Observance some calculations and compliance works regarding to Graduate Thesis.
June 2007August 2007
3 months

Aktobe, www.weatherford.ru

Geophysist-operator
Well logging, well perforation, testing, wireline.
February 2004July 2004
6 months
Taraz State University

Taraz

Teaching assistant
Assisting of professors, helping in preparing of lectures, software. Developing and compiling broshures and broadsheets. Labaratory assisting, analyzing new technological experience, preparing some applications.
January 2003March 2003
3 months
Karachaganak Petroleum Operating

Aksay (Kazakhstan), www.kpo.kz

Operator
Trainee operator at Unit-3 and in Well Operations department.
June 2001September 2001
4 months
Caspimunaigas

Atyrau

Oil and Gas... Show more

Technician of 7th category
field data gathering; interpretation of reservoir data of Tengiz, Korolevskoe and other fields; preparation of reports; site visits

About me

I am working within Tengizchevroil Facilities Engineering Projects Engineering Department. I have several projects in portfolio and four positions of direct reports. The budget of projects between $ 5MM and $100MM. I was involved in construction and completion of Wastewater Treatment and Recycling Facilitites processes at Tengiz field. I have worked as Director of Production and Technical Department and as Project Execution Manager within "AksaiGasService" JSC in 2010-2011, Karachaganak field. On 2010, I have been involved in construction of Kashagan Industrial Buildings at Karabatan as Construction Mechanical Engineer of PIM company (HVAC Contractor of GATE Company). Before this, I have worked as an Associate Project Engineer and Mechanical Engineer in PSN company and had a good experience been working with specialists from UK and Kazakhstan. They supported me with multidisciplinary issues. Whilist studing in Turkey I have been invited to participate in laboratory works as an assistant and it was conditionally needed for my graduate thesis completion. My thesis project includes reservoir and production parts of Petroleum and Natural Gas Engineering. I analyzed field performance prediction of oil and gas reservoirs. I used Fortran and Ecrin 4.10 (Saphir) programs for my research. Moreover, my last internship within Weatherford company consists Well Logging, Wireline. I worked at Zhanazhol and Kenkiyak fields in Aktobe oblast of Kazakhstan and experienced in team work. In 2003 I had experience as bachelor student in Karachaganak field of Western Kazakhstan oblast. I experienced in Production Department and then in Unit-2 as technician-operator and translator.

Higher education (master)

2009
Istanbul Technical University
Petroleum and Natural Gas Engineering, Master of Science
2003
Taraz State University
Petroleum and Natural Gas Engineering, 5 year engineer

Languages

KazakhNative


EnglishC2 — Proficiency


RussianC2 — Proficiency


TurkishC2 — Proficiency


Tests, examinations

2014
TOEIC
TengizChevrOil, Test of English for International Communication
2006
TOEFL
Istanbul Test Center, 187/300

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Armenia, Belarus, Kazakhstan, Kyrgyzstan, Russia

Desired travel time to work: Doesn't matter