Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Была на сайте вчера в 11:02

Кандидат

Женщина, 30 лет, родилась 10 февраля 1995

Предложили работу, решает

Аксай (Казахстан), готова к переезду, готова к редким командировкам

Engineer

700 000  на руки

Специализации:
  • Инженер ПТО, инженер-сметчик
  • Инженер-конструктор, инженер-проектировщик

Занятость: полная занятость, проектная работа

График работы: сменный график, вахтовый метод

Опыт работы 6 лет 7 месяцев

Апрель 2024по настоящее время
1 год
KMGP LLP- Tengizchevroil
Mechanical designer-Piping Engineer
Location: TCOV. (Tengiz) Performs duties under the general supervision of the line manager. Ensures timely development of technical documentation and drawings. The preparation of drawings and or 3D modeling related to discipline in accordance with the agreed work scope. Provided drawings/sketches in the development of design tasks or updates of project drawings, in basic design data gathering, site surveying, petrification to resolving of technical issues on the project, work with AutoCAD / Microstation software packages, understands detailed drawings and the required specification. Petrification to find piping materials to carry out design activities within an area of a project and ensure that the technical and safety integrity of the design is maintained and that the Company and Project procedures are adhered to aware of and adhere to the Company core values, systems and processes.
Апрель 2023Апрель 2024
1 год 1 месяц
KKS Sicim
Piping Engineer
Karachaganak Expansion Project KEP1A Location: Temporary site facilities. Provided day to day support to Line Manager for all activities required to implement the project execution plan, plus provided support to project activities for construction to achieve the established milestones and goals. Find and offering solutions in portions to engineering department, facilitate the Engineering design ensuring that quality is maintained and that the required engineering deliverables are produced in accordance with the project schedule and cost. Ensured that the procurement activities are coordinated such that they provide the necessary construction deliverables for the project construction phase. Worked closely with Line Manager, Construction Supervisor, Field supervision for construction, Project Material Engineer and QC department. Preparation and checking/analyzing of technical documentation and project drawings (Piping and instrumentation diagram, piping isometric drawings, piping connections and piping\mechanical details). Analyzed of as-built technical documentation, 3D model review on 3D scanned files in 3D Autodesk Navisworks Freedom 2023 software. Resolution of technical issues inside discipline adherence to project procedures and provide technical assistance to site, Site surveying according to development of perform activities on site, Checking drawings by activities on site. Dimension calculation and material selection according to ASME, ANSI standards, (KPO Piping material class specification).
Октябрь 2021Апрель 2023
1 год 7 месяцев
KPJV (Fluor)
Construction Engineering Specialist 1
TCO FGP WPMP 3GP Project. Location: 3GP (40 area), 3GI (TCF). Conducting 3D visualization for the shutdown of equipment and each cut-off point throughout the 3GP. Performing the function of a contact person for personnel who need 3D visualization on TWO issues for the shutdown of mechanical equipment. Coordinates the installation of software for InVision workstations and ensures their correct configuration. Provides visualization reports needed by the outage tracking system group. Provides and coordinates all InVision/SPR software processing updates for InVision workstations. Interpret basic information and 3D models to further assist stakeholders. Study systems and their completion processes. Understand the basics of qualification of work activities in accordance with the safety instructions of the PTW and assist working groups in preparing PTW for equipment shutdowns. Need to establish strong alliance and interface with FGP Construction, Systems Completion, Operations & for matters relating to the control of work through the PTW process. Working with 3GI & 3GP Project 3D model using SmartPlant Review. Creating daily reports reflecting construction progress starting from underground and aboveground piping, steels, fabrication pipe spools, cable tracks, equipments. Generation of reports on the status of construction of the 3GI project for each site in relation to the initial data from the contractors involved in the construction of this facility. Calculation of the scope of work using a 3D model of the object. Extraction and processing of information on the project from the 3D model using the Invision application and the formation of visual reports to provide to the customer. Develop and update regular progress reports in 3D covering Materials, Design, Construction, Front Planning works, acceptance and surrender according to project requirements. Providing the entire project team with different visualizations to improve overall planning and communication to support construction. Ensure and coordinate the installation of software for InVision workstations and ensure that each workstation is installed and set up correctly. Providing and coordinating all InVision updates for InVision construction site workstations. SPR/InVision training and support for SmartPlant Review and InVision users.
Октябрь 2020Октябрь 2021
1 год 1 месяц
Sicim S.p.A.
Technical Project Engineer (Pipeline)
TCO FGP WPMP Project. Gathering system. Location: 3GP (Field) Preparation and checking/analyzing construction drawings and technical documentation for variety Pipeline Crossings installation at “Gathering System” oilfield for transportation fuel gas, multiphase oil from new multi wells to 3GP/3GI plants, according to Engineering Specs from Fluor-KPJV. Construction work for preparation drawings and technical documentation includes: trench excavation, welding work, trench preparation for the new oil Pipeline lowering, bypass road installation under the existing Crossings construction (trenchless and open cut). All work executed in compliance with construction Quality Assurance requirements related Chevron specifications and Republic of Kazakhstan Safety regulations. Work with design specifications, technical drawings and scope of works for each project. Manage efficient operation of the site Technical Query system and provision of correct interpretation of design to Contractor. Regularly visits the work site to understand tactical and strategic issues and implement solutions. Designing project in 2D and 3D modeling systems AutoCad of production facilities. Communication with others in the design team and subcontractor, including client. Provided as-built drawings and redline mark-up drawings, attending meetings on site, materials take off and issued mechanical material request, Technical support and supervision for site construction, method statement as require activity to construction site, lifting load for equipment and pipes, Site Query of Engineering (SQE) for any change proposal. Explain detail of construction drawing and give an instruction to fabrication shop supervisor or onsite supervisor; Ensure to drive project to meet with Client standard and knowledge GIS system of TCO.
Март 2019Февраль 2020
1 год
Garant Project LLP ( Aksai Industrial Park)

Аксай (Казахстан), www.aip.kz

Промышленное оборудование, техника, станки и комплектующие... Показать еще

Junior Piping Engineer
Engineering survey: UNIT-2; UNIT-3; KPC. During Shut Down: PILOT CAMP. Performed Projects did with Selection and analysis of as-built technical documentation, 3D modeling, Preparation of Isometric drawings of Piping / Pipeline and equipment connections. Analyze the location, Pipings / Pipelines, Equipment on 3D scanned files. Participation in Shut Down 2019. Working with Field Engineering Department. (KPO B.V.) Execution of work on project. Resolution of technical issues inside discipline adherence to project procedures and design requirements. Development of studies perform activities (DETAIL Project phases) and provide technical assistance. Interface with other project discipline. Preparation of technical documentation: Workpack, Document Index, Tie-in List, Material take off List, Piping Scope of work, Plot Plans, General piping layout plans, Piping arrangements, Special supports and fittings, Site Survey Reports, Piping and Instrumentation Diagrams. Dimension calculation and material selection according to ASME, ANSI standards (KPO Piping material class specification) Design in the system AutoCAD and AutoCAD Plant 3D. Elaborate of design documentation: project drawings (isomet- ric drawings, 3-measurable drawings). Preparation of working drawings, construction drawings and pip- ing and instrumentation diagrams (P&ID). Development of technical and working drafts to composite constructions. Drawing up of detailing, working plans and special units on the basis of basic diagrams and outline sketches.
Февраль 2018Март 2019
1 год 2 месяца
Garant Project LLP ( Aksai Industrial Park)

Аксай (Казахстан), www.aip.kz

Промышленное оборудование, техника, станки и комплектующие... Показать еще

Mechanical CAD engineer
Location: Promzone, office. Preparation and assistance in preparation of technical documentation: Workpack, Document Index, Tie-in List, Material take off List, Piping Scope of work, Plot Plans, General piping layout plans, Piping arrangements, Special supports and fittings, Site Survey Reports, drawings and diagrams. Design in the system AutoCAD. Elaborate of design documentation: project drawings (isometric drawings, 3-measurable drawings). Preparation of working drawings, construction drawings and piping and instrumentation diagrams (P&ID). Electrical Scope Of Work, drawings and diagrams. Preparation wiring diagrams for field instruments, junction boxes and marshalling cabinets, interconnection diagram, single line diagram, equipment location plan, electrical schematic drawings, cable schedules, electrical equipment datasheets, cable routing layout, electrical heat tracing isometric. Hook Up Diagram, Instrumentation Loop diagram, Cable Schedule, Cable routing layout, Instrument alarm and trip schedule, schemes of junction boxes and Distribution board, wiring diagram, Instrument location layout demolition-installation.

Навыки

Уровни владения навыками
AutoCAD
Autocad plant 3D
ArchiCAD
Kompas 3D
Bentley Microstation
Pipe Data
Working with standards ( ASME, ANSI, GOST)
Working with 3D scan
3D modelling
Preparing technical documentation
Reporting
Reading drawings
Engineering design
Oil and Gas industry
Presentation skills
Business letters
Piping
Isometric drawings
Mechanical drawings
Demolition and Installation
Preparing technical acts
Working with client comments
Flanges, Fittings, Gaskets, Valves, Bolts, Pipe supports
Pipe classes, Pipe materials
Checking Project documentation
MS office, Outlook
GIS
PowerBI
MS Plus
Smart Review (SPR)

Опыт вождения

Права категории B, C

Обо мне

Дополнительные сведения: Командная работа, надежность. Легко обучаема и принимаю самостоятельные усилия по достижению требуемого уровня знаний.

Высшее образование

2017
West Kazakhstan Agricultural-Technical University after Zhangir-Khan
Mechanical Engineering, Construction

Знание языков

КазахскийРодной


АнглийскийB2 — Средне-продвинутый


РусскийC2 — В совершенстве


Повышение квалификации, курсы

2018
H2S
Trening Center, Mechanical engineer

Тесты, экзамены

2021
H2S/PTHA
Training Delivery, Engineer

Гражданство, время в пути до работы

Гражданство: Казахстан

Желательное время в пути до работы: Не имеет значения